Novin-Ray Industries' cooling pump required a high-torque motor-gearbox; the whole project was completed in 14 days, from load calculations to installation.
The machine was built, put through a 1,000-hour load test and delivered with on-site installation and a cold start-up; the pump has been running at full capacity since day one.