Project background
Kaveh Cement's production line runs on a 2,500 kW gearbox that, after years of service, suffered P9 gear-housing wear and vibration above the permitted limit, causing frequent stoppages. The plant was looking for a solution that would restore the line without a full machine replacement and without a long outage.
The challenge
- P9 gear-housing wear and 6.5 mm/s vibration, above the permitted limit
- Oil temperature rising above 70 degrees during peak shifts
- Frequent stoppages; an average of three per week
- No access to the original manufacturer's genuine parts
Our solution
In 6 weeks, we completed a controlled disassembly, FEA analysis of the gear housing, gear rebuild in P5-grade 42CrMo4, bearing replacement and reassembly on calibrated equipment; the machine then took a 1,000-hour load on our test rig with vibration and temperature monitoring before being returned to the line.
Our goal was an uninterrupted line; a machine that would work for years on a scheduled-maintenance program instead of constant repairs.
Result
Machine vibration dropped from 6.5 to under 2.5 mm/s, nameplate capacity returned to 100% and the line ran for the following 12 months without a single extra stoppage. The repair cost around 35% of a new machine; with a 24-month warranty on the rebuilt gear housing.