For Kish Shipyard's lines, we kept 200 dedicated spare parts (bearings, gears, drives) in a dedicated warehouse with fast dispatch.
Result: the line's lead time stayed under a week and stoppages caused by missing parts were eliminated.
Fazel Tajhiz Pishro
Fazel Tajhiz Pishro
Loading the page…
200 dedicated spare parts in a dedicated warehouse with fast dispatch; line lead time cut to under a week.
Case study · 2026
Vibration monitoring of 5 production lines; from failure prediction to on-time bearing replacement.
Case study · 2024
Conveyor gearbox rebuild; 22% higher efficiency than before the repair.
Case study · 2026
PM contract; 42 scheduled visits in one year, zero unplanned stoppages.
Case study · 2024
Designed and prototyped a 90 kW planetary gearbox in 14 weeks, to match the line's real load.
Case study · 2026
Cooling-pump motor-gearbox; built, tested and installed in 14 days.
Send us your need; Fazel Tajhiz Pishro's engineers review and recommend the best execution path, free of charge.